Winters in Maine can be hard. Some years, it can feel as though they will never end. Collecting sap from maple trees and turning it into maple syrup is a bridge for me that helps pass the end of winter into the beginning of spring and the warmer, sunnier days ahead. Sap runs through the trees when the nighttime temps are below freezing, but the daytime temps start to get a bit melty and warm. The end of winter often seems nearer than it really is...a bright sunny day or two can lead you to believe that you've left those arctic days behind. But there's nearly always one or more last lingering surprise snow squall in store, and it can be hard on your psyche when you are looking forward to packing away winter for another year. I find sap season to be grounding....despite those cold, bitter, windy and snowy days, there is a steady march of daytime temps above freezing as the nights gradually work their way warmer also. When the overnight temps are no longer below 32 F, the sap stops. One can't help but forgive lingering cold temps at night when it means more of that delicious maple syrup to enjoy throughout the rest of the year. It's the sweetest consolation prize.
Once sap is collected, it must be boiled down. It takes approximately 40 parts of sap to produce 1 part of maple syrup. I use sap taps with a hook, and then hang a bucket with a lid from each one. I only have two maple trees, though. Many people now use tubing to direct to a bag or bucket on the ground, or for those with many trees, they might set up a network of tubing from each tree that converges and combines in one central location at the lowest elevation.
So, for the next few weeks, I will be watching the sap fill my buckets, then collecting them each evening and boiling them down. It will keep me distracted until the weather is mild and it's time to put those seedlings in the garden.
A wicked good blog about homestead happenings in the shadow of Mount Katahdin, Maine. Many ramblings are sure to happen here, including, but not limited to, knitting, sewing, chickens, gardening, canning, freeze drying, general homestead wanna-be stuff (you can be a homesteader with just chickens, right?!?), and any other activities that manage to capture my short little attention span at the time.
Search World On A String Designs
Sunday, March 17, 2024
Wednesday, March 13, 2024
Quick March Sock Update
We are coming up on the middle of March, and I have an update on my Solo Sock Club. I am working on the Laxo Socks, which are a toe-up pattern, and I am working them two at a time. While this does give me the opportunity to use up every last bit of color in this gradient-dyed sock yarn, I must confess that two-at-a-time socks seem to take FOREVER for me. On the bright side, when you are done with one, you are done with both, but....it feels like a slog to me.
Here is where I stand with March's project: Generally, I consider when the heel is turned on a sock that I am about halfway through. These ones may not be quite so far along, as I usually do have a significant amount of yarn leftover when my socks are finished, but in this case, I will continue knitting in pattern until I run out of yarn. I also tried them on at one point and didn't think there was enough length for my toes to be comfortable, so I ripped it back to the gusset increases and added about another 3/4 inch in length. Overall, I feel just about on target with these. I am ~about~ halfway done with the socks and also ~about~ halfway through the month of March. I'll continue to try to get about 30 mintues a day in on sock knitting before moving on to other projects. I am loving the way the gradient is working up on these. Next up is starting the mock cable portion of the pattern, and that's when the pattern really starts to shine. Stay tuned!
Here is where I stand with March's project: Generally, I consider when the heel is turned on a sock that I am about halfway through. These ones may not be quite so far along, as I usually do have a significant amount of yarn leftover when my socks are finished, but in this case, I will continue knitting in pattern until I run out of yarn. I also tried them on at one point and didn't think there was enough length for my toes to be comfortable, so I ripped it back to the gusset increases and added about another 3/4 inch in length. Overall, I feel just about on target with these. I am ~about~ halfway done with the socks and also ~about~ halfway through the month of March. I'll continue to try to get about 30 mintues a day in on sock knitting before moving on to other projects. I am loving the way the gradient is working up on these. Next up is starting the mock cable portion of the pattern, and that's when the pattern really starts to shine. Stay tuned!
Subscribe to:
Posts (Atom)